You don't have javascript enabled. Good luck with that.
Pencarian
Munjirin Tinjau Tiga Waduk di Jaktim

Munjirin Inspects Reservoir and Embung Revitalization Project

East Jakarta Mayor, Munjirin together with his ranks inspected revitalization project of Aneka Elok Reservoir in Penggilingan, and Pekayon Reservoir in Pekayon Urban Village.

overcome inundation and flooding

Munjirin said the revitalization of those reservoirs are conducted by East Jakarta Water Resources Sub-agency through third party mechanisms.

Jakarta Preps for Extreme Weather through February 2026

"This reservoir revitalization program is one of the efforts to overcome inundation and flooding in East Jakarta," he said, Tuesday (11/11).

Munjirin explained that after the revitalization is completed, the existence of reservoirs and ponds will not only be felt for controlling flooding or inundation, but can also be used as spaces for community interaction, tourism, and sports facilities.

Meanwhile, Head of East Jakarta Water Resources Sub-agency, Abdul Rauf admitted there have been no significant obstacles in the work process, except when there is heavy rain.

"This revitalization will certainly increase the capacity of reservoirs and ponds," he admitted.

According to him, Giri Kencana Reservoir can reduce approximately 20,000 cubic meters of water from the Cilangkap area. Furthermore, the capacity of the Aneka Elok Reservoir has been increased from 6,000 cubic meters to 10,000 cubic meters.

"A pump unit with a capacity of 2,000 liters per second is also added to accelerate the reduction of waterlogging around the reservoir area," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1395 personFakhrizal Fakhri
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye990 personAldi Geri Lumban Tobing
  3. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye865 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye755 personAldi Geri Lumban Tobing
  5. Jalan RS Fatmawati Widening Supports Transit-Oriented Development

    access_time19-02-2026 remove_red_eye712 personTiyo Surya Sakti