You don't have javascript enabled. Good luck with that.
Pencarian
UPT Alkal SDA DKI Siapkan Sejumlah Sarana Prasarana Baru di Akhir Tahun
.
photo Nurito - Beritajakarta.id

Strengthening Flood Control Efforts, the Alkal Unit Adds New Infrastructure

The Water Resources Agency's Technical Management Unit for Equipment and Supplies (UPT Alkal) added new facility and infrastructure in order to support flood and inundation handling.

All mobile pumps have been disbursed

Falaah Nugraha, Head of Water Resources Agency's Technical Management Unit for Equipment and Supplies, said a number of new supporting facilities include 21 electric dump trucks powered by electricity, with details of eight units with a capacity of five cubic meters, eight units with a capacity of seven to 7.3 cubic meters, and five electric dump trucks with a capacity of six cubic meters.

Anwar Bolsters Mampang Flood Defenses with New Equipment Grant

"This electric dump truck is our first electric vehicle trial. However, we will continue to evaluate it over the next year," he said, Tuesday (12/30).

According to Falaah, all electric dump trucks will be operated by the East Jakarta Water Resources Sub-agency, but afterward, they must return to the Alkal Technical Implementation Unit (UPT Alkal) office in the Pinang Ranti area. This is because the Electric Vehicle Charging Station (SPKL) is only available at the UPT Alkal office.

"There are two slots or chargers for charging electric vehicles in this office," he added.

In addition to dump trucks, Falaah continued, his side also added five mobile pump units with a capacity of 500 liters per second.

"All mobile pumps have been disbursed to five administration areas," he continued.

Then a double-cabin truck and 12 floating pumps, each with a capacity of 50 liters per second, were purchased. These floating pumps are specifically designed to handle flooding on roads with a depth of 20-30 centimeters.

"Seven floating pumps have been disbursed to East Jakarta Water Resources Sub-agency and the remaining five pumps to be disbursed later," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye864 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye421 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye369 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye353 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye334 personAldi Geri Lumban Tobing
close