You don't have javascript enabled. Good luck with that.
Pencarian
Rano Pastikan Longsor di Bantaran Kali Angke Hulu Telah Ditangani

Rano Confirms Landslide on the Angke Hulu River Bank Already Handled

Jakarta Deputy Governor, Rano Karno confirmed that the landslide on the banks of the Angke Hulu River in Kembangan Selatan, Kembangan, West Jakarta, has been resolved. The retaining wall construction is targeted for completion by mid-January 2025.

mid-January at the latest

"It has been handled. The total length is about 20 meters," he said, Monday (1/5).

Anwar Bolsters Mampang Flood Defenses with New Equipment Grant

Rano explained West Jakarta Mayor Iin Mutmainah has inspected the location and is currently in the process of constructing a retaining wall using gabions.

Head of West Jakarta Water Resources, Purwanti said the process of repairing the retaining wall using river stone gabion material has begun since Saturday (1/3).

The gabion construction covers a length of approximately 20 meters and a height of approximately four meters. The technical work involves 30-50 workers each day.

"If the weather permits, the project will take approximately 10 days. It should be completed by mid-January at the latest," she admitted.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1395 personFakhrizal Fakhri
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye990 personAldi Geri Lumban Tobing
  3. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye865 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye755 personAldi Geri Lumban Tobing
  5. Jalan RS Fatmawati Widening Supports Transit-Oriented Development

    access_time19-02-2026 remove_red_eye712 personTiyo Surya Sakti