You don't have javascript enabled. Good luck with that.
Pencarian
Sejumlah petugas sedang melakukan pemeriksaan PJU di Jl MH. Thamrin

C. Jakarta Public Works Build 527 Street Lights 10 Bridges

The Central Jakarta Public Works Sub-agency built 627 public street lights and 10 inter-village bridges in eight districts along January to December 2025.

spread into 394 points of roads and 233 collector points

Head of the Sub-agency, M Soleh said those public street lights construction was requested by local residents through Musrenbang.

PT JIP Provides Smart Street Light in Gunawarman

"The public street lights are spread into 394 points of roads and 233 collector points," he said, Wednesday (1/21).

He hopes that the construction of these street lighting facilities will make the Central Jakarta area safer and more comfortable, especially at night.

Moreover, the Sub-agency also built 10 inter-village bridges at Pasar Baru, Serdang, Kalibaru, Paseban, Kali Pasir, Gelora, Tanah Rendah, Cideng and two units at Poncol.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye1052 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye671 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye650 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye630 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye608 personTiyo Surya Sakti