You don't have javascript enabled. Good luck with that.
Pencarian
Proyek Pengolahan Air laut Terkendala Anggaran

Sea Water Processing Project will Complete This Year

The project of processing sea water to be plain water in Karya Island, North Seribu Islands Sub-District.

There have been water well and warehouse, including pipeline, there are still pump and some installations left

Acting (Plt) of Seribu Islands Regency, Budi Utomo stated, currently it has been entering the step of warehouse construction and water reservoir tubs also water well located in the dock of Karya Island. 

"There have been water well and warehouse, including pipeline, there are still pump and some installations left," he explained, Monday (7/20). 

Jakpro and Pertamina Gear Up to Build PLTG

The project, he continued, was stopped due to the city budget was not disbursed yet. "Hopefully the project will be done this year," he hoped. 

According to him, plain water or drink water needs in Seribu Islands  is very vital, citizens at this time using ground water which is little brackish, yet really helpful for the locals. 

By the processing installation of sea water to be plain water, citizens are no longer having  water difficulty for cooking needs.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2633 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2355 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye975 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye839 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye734 personBudhi Firmansyah Surapati