You don't have javascript enabled. Good luck with that.
Pencarian
Proyek Pengolahan Air laut Terkendala Anggaran

Sea Water Processing Project will Complete This Year

The project of processing sea water to be plain water in Karya Island, North Seribu Islands Sub-District.

There have been water well and warehouse, including pipeline, there are still pump and some installations left

Acting (Plt) of Seribu Islands Regency, Budi Utomo stated, currently it has been entering the step of warehouse construction and water reservoir tubs also water well located in the dock of Karya Island. 

"There have been water well and warehouse, including pipeline, there are still pump and some installations left," he explained, Monday (7/20). 

Jakpro and Pertamina Gear Up to Build PLTG

The project, he continued, was stopped due to the city budget was not disbursed yet. "Hopefully the project will be done this year," he hoped. 

According to him, plain water or drink water needs in Seribu Islands  is very vital, citizens at this time using ground water which is little brackish, yet really helpful for the locals. 

By the processing installation of sea water to be plain water, citizens are no longer having  water difficulty for cooking needs.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1303 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye844 personAldi Geri Lumban Tobing