You don't have javascript enabled. Good luck with that.
Pencarian
Pompa Pengolahan Air Laut Terkendala Daya Listrik

Desalination Pump in Pulau Karya Constrained by Electricity Problem

Seribu Island Acting Regent (Plt), Budi Utomo complained about the lack of electricity supply to the Karya Island and Panggang Island. Besides disturbing citizens activity, this problem also disturbs the performance of desalination pumps.

We need high voltage electricity to power up the desalination pump. Especially the pump was still in trial process

3 Water Processing Installations Built in Jakarta

"We need high voltage electricity to power up the desalination pump. Especially the pump was still in trial process," told Utomo

To add power, Utomo admitted that he had coordinated with PT PLN but still has no result until now. He expected the electric power can be immediately added so the citizens' complaints related to the lack of fresh water can be resolved.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1087 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye569 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye487 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye472 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye469 personBudhi Firmansyah Surapati