You don't have javascript enabled. Good luck with that.
Pencarian
Penghuni Berharap Rusun Cibesut Segera Direhab Total
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Cibesut Flat Citizens Requesting for Total Renovation

Citizens living in Cipinang Besar Utara (Cibesut) Flat is requesting the flat facilities to be improved. This is because many flat facilities are damaged.

All I know is the flat will totally be rehabilitated. There will be build 1 block with 16 floors and 276 units

The flat which was built in 1987, is consisting of four blocks with 152 units. From that number, there are only 145 units occupied. And the rest 7 units in Block C are damaged and cannot be occupied.

Djarot Wants Flat Road Not to Be Asphalted

As experienced by Yunita (51), one of occupants in Block B unit 103. She admitted, the roof of his unit already fragile. 

β€œThe danger was when I was sleeping. If I was careless, I could be the downfall of wood chips roof,” she expressed, Tuesday (9/2).

Head of Flat's Management Unit (UPRS) Regional III for Jakarta Housing and Government's Building Department, Sayid Ali disclosed had a plan to rehab the flat totally.

β€œAll I know is the flat will totally be rehabilitated. There will be build 1 block with 16 floors and 276 units,” he finished.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1041 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye907 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye549 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye381 personAldi Geri Lumban Tobing