You don't have javascript enabled. Good luck with that.
Pencarian
Penghuni Berharap Rusun Cibesut Segera Direhab Total

Cibesut Flat Citizens Requesting for Total Renovation

Citizens living in Cipinang Besar Utara (Cibesut) Flat is requesting the flat facilities to be improved. This is because many flat facilities are damaged.

All I know is the flat will totally be rehabilitated. There will be build 1 block with 16 floors and 276 units

The flat which was built in 1987, is consisting of four blocks with 152 units. From that number, there are only 145 units occupied. And the rest 7 units in Block C are damaged and cannot be occupied.

Djarot Wants Flat Road Not to Be Asphalted

As experienced by Yunita (51), one of occupants in Block B unit 103. She admitted, the roof of his unit already fragile. 

β€œThe danger was when I was sleeping. If I was careless, I could be the downfall of wood chips roof,” she expressed, Tuesday (9/2).

Head of Flat's Management Unit (UPRS) Regional III for Jakarta Housing and Government's Building Department, Sayid Ali disclosed had a plan to rehab the flat totally.

β€œAll I know is the flat will totally be rehabilitated. There will be build 1 block with 16 floors and 276 units,” he finished.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye681 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye512 personAldi Geri Lumban Tobing
  3. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye511 personAldi Geri Lumban Tobing
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye483 personFakhrizal Fakhri
  5. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye480 personAnita Karyati