You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Alu-alu Mulai Dinormalisasi
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Alu-alu Connecting Channel Normalized

An Alu-alu connecting channel located in Pulo Gadung Sub-District, East Jakarta begins to be normalized. According to the plan, it is targeted to finish in early December.

Normalization has begun this week. In downstream, the water will be directed to Sunter River

Besides dredging mud, it also includes sheet pile reparation. This way is hoped able to reduce puddles along Jalan Pisangan Lama, Pisangan Timur Urban Village, Pulo Gadung.

Section Head of Water Management for East Jakarta Water Management Sub-Department, Mukhid admitted in last rainy season, the area was inundated up to 20 cm. To solve it, the channel was drained from upstream of Jalan Wisma Jaya to downstream, downstream of Jalan Alu-alu, Jatinegara Kaum, Pulogadung.

Pulogadung PHB Inspection Road Collapsed

β€œNormalization has begun this week. In downstream, the water will be directed to Sunter River,” he said, Friday (9/25).

Due to unfit land using heavy equipment, he furthered, the process would take a long time.

Afterwards, there would be sheet pile reparation. β€œIt is targeted to be complete this early December,” he disclosed.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1146 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye846 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye826 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye777 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye755 personAldi Geri Lumban Tobing