You don't have javascript enabled. Good luck with that.
Pencarian
 Rusun Pulogebang Sudah Siap Huni

Dozenz of Households in Bidara Cina Undergoing Raffling Phase

Dozens of households in Bidara Cina, Jatinegara, East Jakarta who affected the KBT-Ciliwung waterway construction are undergoing the flat raffling phase.

They can directly stay after getting the key

Residents of RW 04, 05 and 14 who have registered should attach population documents requirement. Afterwards, they required to sign the statement that saying they are ready to occupy the flat at the latest 14 days after receiving the flat key.

East Jakarta Mayor, Bambang Musyawardhana acknowledged about 73 plots will receive the flat key, where it is prioritized to plot owners. As for the other owners, will be considered to occupy the unit in the next phase.

92 Households in Bidara Cina Ready to Be Relocated

β€œIn fact, there is another family living in one plot. The plot is currently being calculated,” he stated, Friday (10/2).

In the raffling phase, the priority is for elderly. They automatically get one unit in the ground floor without any raffling phase.

β€œThey can directly stay after getting the key. Later on, Satpol PP will assist them,” he finished.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2636 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2369 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye981 personFolmer
  4. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye978 personAldi Geri Lumban Tobing
  5. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye847 personFakhrizal Fakhri