You don't have javascript enabled. Good luck with that.
Pencarian
Cegah Genangan, Jaksel Siagakan 63 Mesin Pompa

63 Pump Machines in South Jakarta Alerted

As flood anticipation, as many as 63 pump machines are prepared in 10 sub-districts that spread in South Jakarta.

In South Jakarta, we prepare 63 pumps and are ready to operate

"In South Jakarta, we prepare 63 pumps and are ready to operate. We're also routinely checking them," said Head of South Jakarta Water Management Sub-Department, Deddy Budiwidodo, Tuesday (10/6).

Not only that, he continued, 5 portable pumps are also prepared in residential or on street.

Basuki Optimistic Flood in Jakarta Decreased

"All of those pumps are ready to be operated," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye355 personAldi Geri Lumban Tobing
close