You don't have javascript enabled. Good luck with that.
Pencarian
Basuki Dampingi Presiden Tinjau Pengeboran Proyek MRT

Basuki Accompanied Jokowi Reviewing MRT's Boring Rig

Jakarta Governor, Basuki “Ahok” T Purnama accompanied President Joko “Jokowi” Widodo reviewing the Mass Rapid Transit (MRT) construction this morning at Pemuda Senayan Statue, Senayan.

Yes, we want to see the boring process

 

They wanted to see the boring progress of underground tunnel that began in mid-September.

Jokowi Inaugurated First Boring of MRT Construction

 

Ahok disclosed that Pemuda statue is the first boring site. The boring machine was named by Jokowi, Antareja. “Yes, we want to see the boring process,” he said, at City Hall, Thursday (10/8).

 

President Director of PT MRT Jakarta, Dono Boestami acknowledged the boring site is very narrow. “Nevertheless, we remain do boring,” he uttered.

 

Such boring machine is operated by CP 104 and 105 (Senayan-Setiabudi), namely SOWJ Joint Venture that consists of Shimizu, Obayashi, Wijaya Karya and Jaya Konstruksi.

 

The rig has a diameter of 6.7 meters and 323 tons weight. The construction period will be carried out until December 2016.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1090 personFakhrizal Fakhri
  2. Jakarta Partners with Five Satellite Cities for Greater Jakarta Connected Initiative

    access_time30-07-2026 remove_red_eye620 personBudhi Firmansyah Surapati
  3. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye529 personAldi Geri Lumban Tobing
  4. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye508 personDessy Suciati
  5. Various Events Prepared for Jakarta`s 5th Century Anniversary

    access_time29-07-2026 remove_red_eye490 personFakhrizal Fakhri