You don't have javascript enabled. Good luck with that.
Pencarian
 Terdampak Proyek Tol Becakayu, 100 Lampu PJU di Kalimalang Rusak

Street Lights along Jalan Raya Inspeksi Kalimalang Malfunctioned

As many as 100 street lights and 10 poles along Jalan Raya Inspeksi Kalimalang, East Jakarta, malfunctioned. It was because the uninstallation was not in accordance to the procedure by some executive officers of Bekasi , Cawang, Kampung Melayu toll road construction project.

Many street lights are malfunctioned due to being dredged with backhoe

Head of East Jakarta Industry and Energy Sub-Department, Saukhani stated, those malfunctioned hundreds lights are now stored in warehouse. His party, he told, did not get any compensation for the broken.

Jl Raya Inspeksi Kalimalang Colored With Street Light

"Many street lights are malfunctioned due to being dredged with backhoe. They're should have been uninstalled slowly and gradually," he expressed, Monday (10/19).

He disclosed, usually when contractor is about to uninstall the pole, they will contact his institute. But, they did not do that on the toll road project thus many poles and lights broken.

"The poles are crooked. It can only be used for emergency or in residential," he disclosed.

Linked News
Popular News indeks
  1. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye1129 personAldi Geri Lumban Tobing
  2. Jakarta International Stadium Sets Up Transit Schemes for The Weeknd Concert

    access_time24-09-2026 remove_red_eye876 personAldi Geri Lumban Tobing
  3. Pramono: Climate Action Must Deliver Tangible Benefits to Residents

    access_time25-09-2026 remove_red_eye549 personDessy Suciati
  4. Pasar Baru Rowing Race Set to Take Place This Sunday

    access_time25-09-2026 remove_red_eye513 personFolmer
  5. Kelapa Gading-Manggarai LRT Serves 100,343 Passengers

    access_time26-09-2026 remove_red_eye484 personAldi Geri Lumban Tobing