You don't have javascript enabled. Good luck with that.
Pencarian
 Terdampak Proyek Tol Becakayu, 100 Lampu PJU di Kalimalang Rusak

Street Lights along Jalan Raya Inspeksi Kalimalang Malfunctioned

As many as 100 street lights and 10 poles along Jalan Raya Inspeksi Kalimalang, East Jakarta, malfunctioned. It was because the uninstallation was not in accordance to the procedure by some executive officers of Bekasi , Cawang, Kampung Melayu toll road construction project.

Many street lights are malfunctioned due to being dredged with backhoe

Head of East Jakarta Industry and Energy Sub-Department, Saukhani stated, those malfunctioned hundreds lights are now stored in warehouse. His party, he told, did not get any compensation for the broken.

Jl Raya Inspeksi Kalimalang Colored With Street Light

"Many street lights are malfunctioned due to being dredged with backhoe. They're should have been uninstalled slowly and gradually," he expressed, Monday (10/19).

He disclosed, usually when contractor is about to uninstall the pole, they will contact his institute. But, they did not do that on the toll road project thus many poles and lights broken.

"The poles are crooked. It can only be used for emergency or in residential," he disclosed.

Linked News
Popular News indeks
  1. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2410 personTiyo Surya Sakti
  2. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye1128 personAldi Geri Lumban Tobing
  3. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye878 personFakhrizal Fakhri
  4. Pramono: Jakarta Remains the Capital City Until a Presidential Decree Is Issued

    access_time13-05-2026 remove_red_eye860 personDessy Suciati
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye768 personBudhi Firmansyah Surapati