You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Alokasikan 164 ribu Watt Untuk RO

164,000 Watts Allocated for Water Reverse Osmosis in Seribu Islands

Seribu Islands Industry and Energy Sub-Department allocated a huge power of 164,000 watts for water Reverse Osmosis (IPA RO) treatment plant in Seribu Islands.

The needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands

 

Head of Seribu Islands Industry and Energy Sub-Department, Meilinda Sagala acknowledged the all inhabited islands in Seribu Islands are currently having IPA RO with electrical power.

Power Cell will Be Set in Pramuka Island

 

The needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands,” he said, Monday (10/19).

 

Meilinda added the additional power will be done in several islands. “For power additional IPA RO power, has been prepared in its lanes and we just do the installation matter,” he stated.

 

In the meantime, she added, there is no demand regarding additional power from Water Management Department for machine replacement with higher power capacity to process sea water into fresh water.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1057 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye993 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye965 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye925 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye705 personAldi Geri Lumban Tobing