You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Alokasikan 164 ribu Watt Untuk RO

164,000 Watts Allocated for Water Reverse Osmosis in Seribu Islands

Seribu Islands Industry and Energy Sub-Department allocated a huge power of 164,000 watts for water Reverse Osmosis (IPA RO) treatment plant in Seribu Islands.

The needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands

 

Head of Seribu Islands Industry and Energy Sub-Department, Meilinda Sagala acknowledged the all inhabited islands in Seribu Islands are currently having IPA RO with electrical power.

Power Cell will Be Set in Pramuka Island

 

β€œThe needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands,” he said, Monday (10/19).

 

Meilinda added the additional power will be done in several islands. β€œFor power additional IPA RO power, has been prepared in its lanes and we just do the installation matter,” he stated.

 

In the meantime, she added, there is no demand regarding additional power from Water Management Department for machine replacement with higher power capacity to process sea water into fresh water.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye396 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close