You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Alokasikan 164 ribu Watt Untuk RO

164,000 Watts Allocated for Water Reverse Osmosis in Seribu Islands

Seribu Islands Industry and Energy Sub-Department allocated a huge power of 164,000 watts for water Reverse Osmosis (IPA RO) treatment plant in Seribu Islands.

The needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands

 

Head of Seribu Islands Industry and Energy Sub-Department, Meilinda Sagala acknowledged the all inhabited islands in Seribu Islands are currently having IPA RO with electrical power.

Power Cell will Be Set in Pramuka Island

 

β€œThe needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands,” he said, Monday (10/19).

 

Meilinda added the additional power will be done in several islands. β€œFor power additional IPA RO power, has been prepared in its lanes and we just do the installation matter,” he stated.

 

In the meantime, she added, there is no demand regarding additional power from Water Management Department for machine replacement with higher power capacity to process sea water into fresh water.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5452 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4597 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1800 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1010 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye988 personAldi Geri Lumban Tobing