You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Alokasikan 164 ribu Watt Untuk RO
.
photo Suparni - Beritajakarta.id

164,000 Watts Allocated for Water Reverse Osmosis in Seribu Islands

Seribu Islands Industry and Energy Sub-Department allocated a huge power of 164,000 watts for water Reverse Osmosis (IPA RO) treatment plant in Seribu Islands.

The needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands

 

Head of Seribu Islands Industry and Energy Sub-Department, Meilinda Sagala acknowledged the all inhabited islands in Seribu Islands are currently having IPA RO with electrical power.

Power Cell will Be Set in Pramuka Island

 

β€œThe needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands,” he said, Monday (10/19).

 

Meilinda added the additional power will be done in several islands. β€œFor power additional IPA RO power, has been prepared in its lanes and we just do the installation matter,” he stated.

 

In the meantime, she added, there is no demand regarding additional power from Water Management Department for machine replacement with higher power capacity to process sea water into fresh water.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye653 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye394 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing