You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Alokasikan 164 ribu Watt Untuk RO
.
photo Suparni - Beritajakarta.id

164,000 Watts Allocated for Water Reverse Osmosis in Seribu Islands

Seribu Islands Industry and Energy Sub-Department allocated a huge power of 164,000 watts for water Reverse Osmosis (IPA RO) treatment plant in Seribu Islands.

The needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands

 

Head of Seribu Islands Industry and Energy Sub-Department, Meilinda Sagala acknowledged the all inhabited islands in Seribu Islands are currently having IPA RO with electrical power.

Power Cell will Be Set in Pramuka Island

 

β€œThe needed watt is 164 KVA or 164,000 watts, especially for reverse osmosis in Seribu Islands,” he said, Monday (10/19).

 

Meilinda added the additional power will be done in several islands. β€œFor power additional IPA RO power, has been prepared in its lanes and we just do the installation matter,” he stated.

 

In the meantime, she added, there is no demand regarding additional power from Water Management Department for machine replacement with higher power capacity to process sea water into fresh water.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1535 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye952 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye489 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye445 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye420 personFolmer