You don't have javascript enabled. Good luck with that.
Pencarian
Lima Pulau Jadi Prioritas Pengolahan Air Laut

5 Islands Set For Sea Water Processing Priority

Seribu Islands Regency expects 5 islands which will be set as a sea water processing could be realized in 2016.

We ask, Karya, Kelapa, Harapan, Tidung and Untung Jawa Islands should become our priority

Seribu Islands Regent, Budi Utomo said the current power lines have been connected in RO water pump and only leaves additional power.

164,000 Watts Allocated for Water Reverse Osmosis in Seribu Islands

“As its specification, power must be added as it was for processing raw water and now for seawater becomes sour,” he said, Tuesday (10/20).

Some islands, he added, are already ready from the installation until equipment, and only connect the power.

“We ask, Karya, Kelapa, Harapan, Tidung and Untung Jawa Islands should become our priority,” he uttered.

Meanwhile, Seribu Islands Regency will change its specification related to the decreasing of raw water quantity and quality that produced by Reverse Osmosis (RO). It will be processed from sea water into fresh water.

Linked News
Popular News indeks
  1. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye550 personAldi Geri Lumban Tobing
  2. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye528 personDessy Suciati
  3. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye516 personTiyo Surya Sakti
  4. East Jakarta Repairs Fire Hydrants Damaged by Component Theft

    access_time31-07-2026 remove_red_eye464 personNurito
  5. Rano Karno Hopes Penjaringan Inspires a Citywide Quranic Movement

    access_time31-07-2026 remove_red_eye414 personBudhi Firmansyah Surapati