You don't have javascript enabled. Good luck with that.
Pencarian
DKI Tambah 2 Genset di Rumah Pompa Waduk Pluit
.
photo Bayu Suseno - Beritajakarta.id

City to Add 2 Gensets in Pluit Reservoir Pump House

Jakarta Dept. of Industry and Energy added two new gensets for Pluit Reservoir, Penjaringan, North Jakarta.

In last rainy season, there were only 4 pumps operated due to limited genset power.

Each gensets has 2,275 kilo volt ampere (kva) power and able to operate 10 pumps when the electricity connection is off.

Pump House at Jalan Kartini Raya Equipped with Water Processing Tools

Elisabeth Ratu RA, Head of Electricity, Oil and Gas Energy Management for Jakarta Dept. of Industry and Energy, said the gensets will maximize the existing 10 pumps in Pluit Reservoir. In last rainy season, there were only 4 pumps operated due to limited genset power.

She explained that 10 pumps operation need electricity supply as much as 3,300 KVA. Two additional gensets will be able to accommodate the power to operate the pumps at the same time.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1152 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye849 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye781 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye760 personAldi Geri Lumban Tobing