You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Embung Di Jalan Ahmad Yani Masih Mangkrak

Water Reservoir Construction at Jalan Ahmad Yani Stuck

The construction of water reservoir at Jalan Ahmad Yani, Cempaka Putih Timur Urban Village, Cempaka Putih, Central Jakarta, stuck and not known when it will be finished.

Rainy season is coming, we're afraid the flood would be as high as previous year

"The construction is not finished yet whereas it's needed to handle flood on the road," said Saiful (32), a local resident, Thursday (10/22).

Flood Anticipation, Dredging of Water Channels in Central Jakarta Prioritized

Residents hope the construction to be finished so that the access road would not get overflowed like previous year.

"Rainy season is coming, we're afraid the flood would be as high as previous year," he expressed.

Cempaka Putih Timur Urban Village Head, Sri Harmo confirmed about the matter. His party hopes the related institute could complete the construction.

"Certainly the area is the worst flood point in Cempaka Putih," he disclosed.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye828 personNurito
  2. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye603 personAldi Geri Lumban Tobing
  3. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye549 personDessy Suciati
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye543 personAnita Karyati
  5. Sumenep Park Revitalization to Be Aligned with Gresik River Flow

    access_time18-09-2026 remove_red_eye446 personFolmer