You don't have javascript enabled. Good luck with that.
Pencarian
DKI Tambah 2 Genset di Rumah Pompa Waduk Pluit
.
photo Bayu Suseno - Beritajakarta.id

City to Add 2 Gensets in Pluit Reservoir Pump House

Jakarta Dept. of Industry and Energy added two new gensets for Pluit Reservoir, Penjaringan, North Jakarta.

In last rainy season, there were only 4 pumps operated due to limited genset power.

Each gensets has 2,275 kilo volt ampere (kva) power and able to operate 10 pumps when the electricity connection is off.

Pump House at Jalan Kartini Raya Equipped with Water Processing Tools

Elisabeth Ratu RA, Head of Electricity, Oil and Gas Energy Management for Jakarta Dept. of Industry and Energy, said the gensets will maximize the existing 10 pumps in Pluit Reservoir. In last rainy season, there were only 4 pumps operated due to limited genset power.

She explained that 10 pumps operation need electricity supply as much as 3,300 KVA. Two additional gensets will be able to accommodate the power to operate the pumps at the same time.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1527 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye945 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye478 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye437 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye414 personFolmer