You don't have javascript enabled. Good luck with that.
Pencarian
DKI Tambah 2 Genset di Rumah Pompa Waduk Pluit
.
photo Bayu Suseno - Beritajakarta.id

City to Add 2 Gensets in Pluit Reservoir Pump House

Jakarta Dept. of Industry and Energy added two new gensets for Pluit Reservoir, Penjaringan, North Jakarta.

In last rainy season, there were only 4 pumps operated due to limited genset power.

Each gensets has 2,275 kilo volt ampere (kva) power and able to operate 10 pumps when the electricity connection is off.

Pump House at Jalan Kartini Raya Equipped with Water Processing Tools

Elisabeth Ratu RA, Head of Electricity, Oil and Gas Energy Management for Jakarta Dept. of Industry and Energy, said the gensets will maximize the existing 10 pumps in Pluit Reservoir. In last rainy season, there were only 4 pumps operated due to limited genset power.

She explained that 10 pumps operation need electricity supply as much as 3,300 KVA. Two additional gensets will be able to accommodate the power to operate the pumps at the same time.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye966 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye778 personBudhi Firmansyah Surapati
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye445 personFolmer
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye410 personTiyo Surya Sakti
  5. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye351 personBudhi Firmansyah Surapati