You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Embung Di Jalan Ahmad Yani Masih Mangkrak

Water Reservoir Construction at Jalan Ahmad Yani Stuck

The construction of water reservoir at Jalan Ahmad Yani, Cempaka Putih Timur Urban Village, Cempaka Putih, Central Jakarta, stuck and not known when it will be finished.

Rainy season is coming, we're afraid the flood would be as high as previous year

"The construction is not finished yet whereas it's needed to handle flood on the road," said Saiful (32), a local resident, Thursday (10/22).

Flood Anticipation, Dredging of Water Channels in Central Jakarta Prioritized

Residents hope the construction to be finished so that the access road would not get overflowed like previous year.

"Rainy season is coming, we're afraid the flood would be as high as previous year," he expressed.

Cempaka Putih Timur Urban Village Head, Sri Harmo confirmed about the matter. His party hopes the related institute could complete the construction.

"Certainly the area is the worst flood point in Cempaka Putih," he disclosed.

Linked News
Popular News indeks
  1. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye754 personBudhi Firmansyah Surapati
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye736 personAldi Geri Lumban Tobing
  3. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye666 personDessy Suciati
  4. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye558 personAldi Geri Lumban Tobing
  5. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye533 personAldi Geri Lumban Tobing