You don't have javascript enabled. Good luck with that.
Pencarian
284 Titik Lampu PJU Dipasang di Pedestrian Jl Pemuda
.
photo istimewa - Beritajakarta.id

284 Street Lights Being Installed on Jalan Pemuda

As many as 284 Light Emitting Diode (LED) street lights are being installed along Jalan Pemuda, Pulogadung, East Jakarta.

The new street lights use LED type

"The new street lights use LED type that will last up to 6 years. While Hight Pressure Sodium (HPS) type only last up to 2 years," said Head of akarta Industry and Energy Department, Yuli Hartono, Sunday (10/25).

Besides that, according to him, as many as 49 street lights are also being installed on Jalan Jatinegara Timur, Jatinegara, East Jakarta. It is targeted to be complete by the end of December.

2 Spotlights Installed at Fire Scene in Rawamangun

Head of East jakarta Industry and Energy Sub-Department Saukani added that based on the data he has, the installation process on the both of road has only reached 35 percent.

"Besides beautifying the city at night, those lights are also hoped could minimize criminality number," he disclosed.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye328 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye318 personAldi Geri Lumban Tobing
  4. Rivers with Severe Pollution in Jakarta Decrease

    access_time18-07-2025 remove_red_eye236 personAldi Geri Lumban Tobing
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye233 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik