You don't have javascript enabled. Good luck with that.
Pencarian
       60 Karung Lumpur Terkumpul Dari Kali Beton

60 Sacks of Sediment Dredged from Beton River

As many as 60 sacks of sediment mixed with trash were dredged from Beton River, Tangki Urban Village, West Jakarta. It is as anticipation before rainy season, so that the Ciliwung Rivulet capacity would be increased.

While waiting for sheet pile installation, all we can do is dredging the sediment to increase the water capacity

"It has been dredged since yesterday," said Tangki Urban Village Head, Suhardin, Wednesday (10/28).

Water Channel Along Jalan Malaka Dredged

According to him, the rivulet has not been dredged for long time. So that it was shallowing and the capacity decreased.

"While waiting for sheet pile installation, all we can do is dredging the sediment to increase the water capacity," he uttered.

He continued, as many as 40 Infrastructures and Public Facilities Handling (PPSU) officers are deployed to the field. "Hopefully, there would be no more overflowing when rainy season," he hoped.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye879 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye801 personAldi Geri Lumban Tobing
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye775 personBudhi Firmansyah Surapati
  4. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye627 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye468 personFolmer