You don't have javascript enabled. Good luck with that.
Pencarian
       60 Karung Lumpur Terkumpul Dari Kali Beton
.
photo Septradi Setiawan - Beritajakarta.id

60 Sacks of Sediment Dredged from Beton River

As many as 60 sacks of sediment mixed with trash were dredged from Beton River, Tangki Urban Village, West Jakarta. It is as anticipation before rainy season, so that the Ciliwung Rivulet capacity would be increased.

While waiting for sheet pile installation, all we can do is dredging the sediment to increase the water capacity

"It has been dredged since yesterday," said Tangki Urban Village Head, Suhardin, Wednesday (10/28).

Water Channel Along Jalan Malaka Dredged

According to him, the rivulet has not been dredged for long time. So that it was shallowing and the capacity decreased.

"While waiting for sheet pile installation, all we can do is dredging the sediment to increase the water capacity," he uttered.

He continued, as many as 40 Infrastructures and Public Facilities Handling (PPSU) officers are deployed to the field. "Hopefully, there would be no more overflowing when rainy season," he hoped.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye654 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye394 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing