You don't have javascript enabled. Good luck with that.
Pencarian
       60 Karung Lumpur Terkumpul Dari Kali Beton

60 Sacks of Sediment Dredged from Beton River

As many as 60 sacks of sediment mixed with trash were dredged from Beton River, Tangki Urban Village, West Jakarta. It is as anticipation before rainy season, so that the Ciliwung Rivulet capacity would be increased.

While waiting for sheet pile installation, all we can do is dredging the sediment to increase the water capacity

"It has been dredged since yesterday," said Tangki Urban Village Head, Suhardin, Wednesday (10/28).

Water Channel Along Jalan Malaka Dredged

According to him, the rivulet has not been dredged for long time. So that it was shallowing and the capacity decreased.

"While waiting for sheet pile installation, all we can do is dredging the sediment to increase the water capacity," he uttered.

He continued, as many as 40 Infrastructures and Public Facilities Handling (PPSU) officers are deployed to the field. "Hopefully, there would be no more overflowing when rainy season," he hoped.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye940 personAldi Geri Lumban Tobing
  2. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye605 personDessy Suciati
  3. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye544 personAldi Geri Lumban Tobing
  4. Transportation Agency Prepares Traffic Management Plan for Indonesia's 81st Anniversary Celebrations

    access_time15-08-2026 remove_red_eye521 personAldi Geri Lumban Tobing
  5. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye473 personDessy Suciati