You don't have javascript enabled. Good luck with that.
Pencarian
PT Aetra Masih Kekurangan Pasokan Air Baku
.
photo istimewa - Beritajakarta.id

PT Aetra Still Lacking of Raw Water Supply

PT Aetra Air Jakarta until this time is still lacking of raw water supply. The lack is up to 3-30 percent. Water supply to serve 2 installation of Water Processing (IPA) is up to 9,600 liters per second. But the water supply is still way below the number.

Raw water supply of Aetra cannot be fulfilled all

Operation Director of PT Aetra Air Jakarta, Lintong Hutasoit stated that water supply in 2 IPA cannot be fulfilled yet by Perum Jasa Tirta II. The two IPA are in Buaran and Pulogadung. Water supply for those IPA fully depend on Jatiluhur Dam.

"Raw water supply of Aetra cannot be fulfilled all," said Hutasoit, during media gathering, in Yogyakarta, Thursday (11/19).

January-October, PT Aetra Obtained 12,000 New Customers

He mentioned that such condition makes his side have to decline clean water production until 25 percent.

Linked News
Popular News indeks
  1. District Community Health Centers in East Jakarta Operate for 24 Hours

    access_time05-04-2025 remove_red_eye501 personNurito
  2. Backflow at Kampung Rambutan Terminal Increases as Mudik Return Flow Peaks

    access_time04-04-2025 remove_red_eye490 personNurito
  3. Kalideres Bus Terminal Adds 55 Night Transport Units

    access_time05-04-2025 remove_red_eye396 personTiyo Surya Sakti
  4. S. Jakarta Transportation Sub-agency Optimizes Services at Tourist Spots

    access_time03-04-2025 remove_red_eye358 personTiyo Surya Sakti
  5. Ship Surveillance in Bokor Island Waters Intensified for Eid Holiday

    access_time03-04-2025 remove_red_eye313 personAnita Karyati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik