You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Sheetpile Bisa Kurangi Genangan Di Ulujami

Sheet Pile Construction Able to Eliminate Puddle

Jakarta Provincial Government commits to continue the construction of sheet pile along 900 meters which passing Pesanggrahan River in Perdatam housing complex and Mini Kontri in Ulujami Urban Village, South Jakarta.

The pump in Mini Kontri and Perdatam keeps running. We’re ready with the flood

Tri Kurniadi, South Jakarta Mayor, said that the inundation around the area will decrease if the sheet pile construction is done.

“The pump in Mini Kontri and Perdatam keeps running. We’re ready with the flood,” he said, Sunday (12/20).

Land Acquisition Hampers Sheet Pile Installation in Pesanggrahan

According to him, the construction is still postponed due to waiting the land buying process in National Land Board.

“The documents are being processed, but we need more personnel to complete the mapping,” he added.

His side has instructed Dept. of Water Management to provide a statement that the land has been paid.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2635 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2367 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye981 personFolmer
  4. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye972 personAldi Geri Lumban Tobing
  5. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye847 personFakhrizal Fakhri