You don't have javascript enabled. Good luck with that.
Pencarian
DKI dan Pemerintah Pusat Sepakati Lebar Rel LRT
.
photo Yopie Oscar - Beritajakarta.id

MRT project Remains Priority

The city administration is about to change trace for Light Rail Transit (LRT) which aims to smoothen its construction and not disturb Mass Rapid Transit (MRT) project.

MRT trace does not changed, because our priority is fast train and MRT

"MRT trace does not changed, because our priority is fast train and MRT," expressed Jakarta Governor, Basuki T Purnama, at City Hall, Tuesday (1/19).

According to him, the delay in MRT project until 28 years, causing trace overlapping trace. There are at least nine stations which intersect on both rail-based transport modes. Because, the LRT is built to become a feeder for MRT.

July, Groundbreaking for LRT Project Carried Out

"Our priority is MRT, for carrying passenger from Balaraja-Cikarang," he stated.

Thus, he continued, trace for LRT must be regenerated in order to avoid overlapping. As planned, it will be shortened.

"This is about delay in MRT project. If it is delay, the trace must be regenerated, so LRT will serve until Pulomas, surely short," he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1066 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye952 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye929 personFolmer
  4. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye814 personBudhi Firmansyah Surapati
  5. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye770 personAldi Geri Lumban Tobing