You don't have javascript enabled. Good luck with that.
Pencarian
DKI dan Pemerintah Pusat Sepakati Lebar Rel LRT

MRT project Remains Priority

The city administration is about to change trace for Light Rail Transit (LRT) which aims to smoothen its construction and not disturb Mass Rapid Transit (MRT) project.

MRT trace does not changed, because our priority is fast train and MRT

"MRT trace does not changed, because our priority is fast train and MRT," expressed Jakarta Governor, Basuki T Purnama, at City Hall, Tuesday (1/19).

According to him, the delay in MRT project until 28 years, causing trace overlapping trace. There are at least nine stations which intersect on both rail-based transport modes. Because, the LRT is built to become a feeder for MRT.

July, Groundbreaking for LRT Project Carried Out

"Our priority is MRT, for carrying passenger from Balaraja-Cikarang," he stated.

Thus, he continued, trace for LRT must be regenerated in order to avoid overlapping. As planned, it will be shortened.

"This is about delay in MRT project. If it is delay, the trace must be regenerated, so LRT will serve until Pulomas, surely short," he closed.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5530 personBudhi Firmansyah Surapati
  2. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1865 personTiyo Surya Sakti
  3. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye862 personAldi Geri Lumban Tobing
  4. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye764 personAldi Geri Lumban Tobing
  5. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye731 personAldi Geri Lumban Tobing