You don't have javascript enabled. Good luck with that.
Pencarian
DKI dan Pemerintah Pusat Sepakati Lebar Rel LRT
.
photo Yopie Oscar - Beritajakarta.id

MRT project Remains Priority

The city administration is about to change trace for Light Rail Transit (LRT) which aims to smoothen its construction and not disturb Mass Rapid Transit (MRT) project.

MRT trace does not changed, because our priority is fast train and MRT

"MRT trace does not changed, because our priority is fast train and MRT," expressed Jakarta Governor, Basuki T Purnama, at City Hall, Tuesday (1/19).

According to him, the delay in MRT project until 28 years, causing trace overlapping trace. There are at least nine stations which intersect on both rail-based transport modes. Because, the LRT is built to become a feeder for MRT.

July, Groundbreaking for LRT Project Carried Out

"Our priority is MRT, for carrying passenger from Balaraja-Cikarang," he stated.

Thus, he continued, trace for LRT must be regenerated in order to avoid overlapping. As planned, it will be shortened.

"This is about delay in MRT project. If it is delay, the trace must be regenerated, so LRT will serve until Pulomas, surely short," he closed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye954 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye661 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye395 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing