You don't have javascript enabled. Good luck with that.
Pencarian
 Ini Skema Aliran Air Dari Pintu Manggarai

Here is Scheme of Water Flow from Manggarai

System of water management in Manggarai Sluice Gate to the Java sea is conducted gradually. It is aimed to reduce flood from Ciliwung River and West Flood Canal (KBB).

Water to Ciliwung will be flowed to Istiqlal Mosque, to west side-Jalan Gajah Mada, until sluice tank and flow to Pluit Dam

Head of River and Central Flow Beach System Division, Jakarta Water Management Dept, Robert Rajaguguk said, water flow from Manggarai is divided into three rivers, namely KBB‎, Gresik River and Ciliwung River towards Gunung Sahari.

Basuki Asks Manggarai Sluice Gate Left Opened

"Water to Ciliwung will be flowed to Istiqlal Mosque, to west side-Jalan Gajah Mada, until sluice tank and flow to Pluit Dam," he expressed, Tuesday (3/1).

As for flow on the east, will go to Ciliwung River in Gunung Sahari-Marina Sluice Gate. The sluice will be opened if the sea is receding and remain closed when the tide.

"We set water flow from Istiqlal sluice, and flowed to west towards Gajah Mada," he told.

He added, this application runs well when the water flow is high enough from Manggarai. Considering water flow from Angke River coming into KBB is quite high, Manggarai is opened about 100 centimeters to reduce water volume.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1608 personFakhrizal Fakhri
  2. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1158 personDessy Suciati
  3. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye949 personNurito
  4. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye947 personBudhi Firmansyah Surapati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye847 personDessy Suciati