You don't have javascript enabled. Good luck with that.
Pencarian
 Normalisasi Ciliwung Tuntas, 9 Wilayah Terbebas Banjir

9 Areas Predicted to Free from Flood

In an effort to tackle flood issue in capital, river normalization project keeps being expedited by Ciliwung-Cisadane Flood Control Office (BBWSCC). It is predicted 9 areas along Ciliwung riverbank will be free from flood shortly after normalization project done.

T he project in East Jakarta keeps ongoing yet we also coordinate for land acquisition in South

Head of BBWSCC, Teuku Iskandar stated the normalization project is carried for 19 kilometers. Started from TB Simatupang bridge to Manggarai Sluice Gate.

Normalization of Ciliwung River Reaches 40 Percent

“Normalization done in two areas, East and South Jakarta. The project in East Jakarta keeps ongoing yet we also coordinate for land acquisition in South,” he uttered, Wednesday (12/16).

Here are 9 areas that is predicted to be free from flood ; Kampung Pulo (Jatinegara),  Bukit Duri (Tebet), Gang Arus Cawang (Kramatjati), Rawajati Kalibata (Pasar Minggu), Bidaracina (Jatinegara), Kebon Baru (Tebet), Pengadegan (Pancoran), Kampung Melayu Kecil/Besar (Tebet) and Kramatjati.

Linked News
Popular News indeks
  1. BI and Jakarta Government Deepen Investment, Creative Economy Collaboration

    access_time09-11-2026 remove_red_eye537 personAldi Geri Lumban Tobing
  2. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye516 personFakhrizal Fakhri
  3. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye511 personAldi Geri Lumban Tobing
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye509 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye493 personTiyo Surya Sakti