You don't have javascript enabled. Good luck with that.
Pencarian
150 Ton Sampah Kiriman di Tebet Diangkut

150 Tons of Garbage Pilling Up in Kampung Melayu Bridge

We predict the garbage volume reaches 150 tons. And now, 30 percent have been transported and is targeted to be finished today

Post-demolishment in Kalibata Bridge, Rawajati Urban Village, Pancoran, garbage pile left by flood from Ciliwung River, moved to Kampung Melayu Bridge, Jl KH Abdullah Syafe'i, South Jakarta. Predicabtly, garbage pilling up in Ciliwung River, around the bridge reached 150 tons.

Based on Beritajakarta.com, garbage stuck around 30 meters of the overall width of the bridge up to 40 meters. Long pile reaches 40-50 meters. Trash that snagged consists of various types, ranging from bamboo, beams, plywood, mattresses, styorofoam, cardboard and so on.

Dredged Mud Left Pilling Up at Riverside

Rahmat, (53), a citizen of Kampung Melayu said, garbage stuck in Kampung Melayu Bridge at around 3 AM. It coincided with the overflow of Ciliwung River. 

"In the past flood, garage was only entangled in Kalibata Bridge. But after being demolished, its garbage moves to Kampung Melayu," he stated, Saturday (4/2).

Head of Water UPK, Jakarta Cleanliness Dept, Junjungan Sihombing diclosed, garbage condition is the same with Kalibata bridge prior to demolishment. "We predict the garbage volume reaches 150 tons. And now, 30 percent have been transported and is targeted to be finished today," he told.

His side sent one long-arm excavator and spider excavator to pick up the garbage. As for garbage transportation towards Bantar Gebang Landfill, as many as nine big trucks and eight small trucks have been alerted.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1883 personFakhrizal Fakhri
  2. Pramono Vows to Prioritize Jakarta’s Strategic Development

    access_time22-08-2026 remove_red_eye829 personDessy Suciati
  3. Pramono Commends Madurese Community for Their Vital Role in Building Jakarta

    access_time19-08-2026 remove_red_eye681 personDessy Suciati
  4. New LRT Jakarta Route Set for Official Launch on August 26

    access_time22-08-2026 remove_red_eye446 personDessy Suciati
  5. Jakarta Agrees on Rp79.59T Revised 2026 Budget Framework

    access_time21-08-2026 remove_red_eye428 personFakhrizal Fakhri