You don't have javascript enabled. Good luck with that.
Pencarian
dermagan retak

Main Dock of Pramuka Island Cracked

The main dock of Pramuka Island, Panggang Island Urban Village, North Seribu Island Sub-district, is damaged. This 80 meters long and 5 meters width dock which was renovated almost a year ago, has cracked for 20 meters.

Hopefully it can be repaired immediately. Don't wait the dock collapsed

There are holes and tilts on some spots of cracked concrete. There is no improvement even though the condition lasts for a month.

Amrullah (38), residents of RT 02/03 Panggang Island, admitted the local residents have complained related to the dock condition. "Hopefully it can be repaired immediately. Don't wait the dock collapsed," he said, Tuesday (4/22).

Damaged Road in Rawa Badak Utara Ignored

Head of Panggang Island Urban Village, Muhammad Ali, admitted the problem has been reported to transportation sub-department.

"We hope the dock can be repaired soon," he hoped.

Linked News
Popular News indeks
  1. Pramono Pushes to Complete Long-Delayed Pluit JLNT by March 2027

    access_time20-11-2026 remove_red_eye660 personDessy Suciati
  2. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye638 personAnita Karyati
  3. Jakarta Strengthens ASEAN Cooperation on Climate, Transport, and Youth

    access_time20-11-2026 remove_red_eye609 personFolmer
  4. BORJU Markets 200 Local Products

    access_time20-11-2026 remove_red_eye574 personAnita Karyati
  5. Jakarta Hosts 2026 UCWDC Asian Championship with 280 Dancers from Five Countries

    access_time20-11-2026 remove_red_eye560 personBudhi Firmansyah Surapati