You don't have javascript enabled. Good luck with that.
Pencarian
dermagan retak

Main Dock of Pramuka Island Cracked

The main dock of Pramuka Island, Panggang Island Urban Village, North Seribu Island Sub-district, is damaged. This 80 meters long and 5 meters width dock which was renovated almost a year ago, has cracked for 20 meters.

Hopefully it can be repaired immediately. Don't wait the dock collapsed

There are holes and tilts on some spots of cracked concrete. There is no improvement even though the condition lasts for a month.

Amrullah (38), residents of RT 02/03 Panggang Island, admitted the local residents have complained related to the dock condition. "Hopefully it can be repaired immediately. Don't wait the dock collapsed," he said, Tuesday (4/22).

Damaged Road in Rawa Badak Utara Ignored

Head of Panggang Island Urban Village, Muhammad Ali, admitted the problem has been reported to transportation sub-department.

"We hope the dock can be repaired soon," he hoped.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1543 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1426 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1293 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1087 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye958 personDessy Suciati