You don't have javascript enabled. Good luck with that.
Pencarian
Penyelesaian Banjir DKI Harus Simultan dari Hulu ke Hilir
.
photo Reza Hapiz - Beritajakarta.id

Flood Management should Be Done Simultaneously

Simultaneous flood management must be provided from upstream to downstream. The handling is not only held by Jakarta Provincial Government, but also all side.

Khusus untuk Sungai Ciliwung kami sudah selesaikan penambahan pintu air di Karet dan Manggarai

Mudjiadi, General Directorate of Water Resource for Ministry of Public Works and Public Housing, admitted one of ways for flood handling is adding water sluice at two locations. Those are Karet and Manggarai sluice gates.

“We have added sluice gates in Karet and Manggarai for Ciliwung river,” he said, Thursday (5/19).

Kodam Jaya’s 34 Ha Land Impacted by Ciliwung Normalization

By adding the sluice gate in Karet, water debit increases from 500 meter cubic to 700 meter cubic, and in Manggarai from 300 meter cubic to 500 mete cubic.

He added that Ciliwung river water debit is under 300 meter cubic. It means river normalization must be applied to add the debit up to 600 meter cubic.

At the upstream area, two reservoirs, Ciawi and Sukamahi will be constructed. River normalization will be applied for midstream and National Capital Integrated Coastal Development (NCICD) for downstream.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye653 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye394 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing