You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Pulo akan Dinormalisasi

Pulo Channel will Be Normalized

The Pulo connecting channel on Jl Jati Padang Baru, RW 06, Jati Padang, Pasar Minggu, will be normalized. All this time, the channel experienced narrowing due to covered by building. Consequently, water from the channel often overflows and inundates citizen residential, RW Jati Padang.

The channel will be widened up to 2.5 meters. We're still waiting for reply from urban village head, because there is building affected the widening process

Head of Jakarta Water Management Sub-dept, Holi Susanto disclosed, citizens have tried to tear down the channel to overcome inundation problem. Because the size and deep only leave 30 cm, the channel cannot accommodate water in large quantities when rain pours.

"The channel will be widened up to 2.5 meters. We're still waiting for reply from urban village head, because there is building affected the widening process," he expressed, Monday (5/30).

2017, Cakung Lama River Normalized

According to him, the widening project would hit buildings that standing on the sides of the channel. Certainly there is no compensation.

Besides normalization, the channel would have an-u-ditch. While at channel, would be installed with box culvert thus water can flow smoothly.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye501 personTiyo Surya Sakti
  3. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye430 personFakhrizal Fakhri
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye373 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye363 personAldi Geri Lumban Tobing
close