You don't have javascript enabled. Good luck with that.
Pencarian
Pengecekan Armada Bus AKAP di Terminal Kalideres

80 Percent of AKAP Bus in Kalideres Terminal Are Unworthy

Directorate General of Transportation for Transportation Ministry is checking up the readiness of intercity-interprovincial (AKAP) bus in Kalideres Terminal, West Jakarta, Monday (6/6). From that, there are only a few viable operation

I am disappointed with Otobus Company (OP) that exists in Kalideres Terminal. There is only 20 percent viable operation

"I am disappointed with Otobus Company that exists in Kalideres Terminal. There is only 20 percent viable operation," said Elly Sinaga, Director of City Transportation System (BSTP), Directorate General of Transportation for Transportation Ministry, Monday (6/6).

Sinaga disclosed this is because the bus has various problems of physical damage, like window broken, bald tire and so on.

Ujung Menteng PKB Still Rampant with KIR Broker

"It is very endangering the passenger. The bus cannot operate temporarily until they meet operational standard," he expressed.

She explains, the bus that passed road-worthiness (kir) test will be given with a sticker thus the passenger feels safety when they ride.

"This checking data result will also be given to the otobus company for standardization or bus reparation," he finished.

In overall, there are three buses stopped due to unworthy. While the other buses given to opportunity for doing reparation.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye486 personTiyo Surya Sakti
  3. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye429 personFakhrizal Fakhri
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye372 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye361 personAldi Geri Lumban Tobing
close