You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Jalan Cempaka Putih Tengah III folmer

Channel Normalization in Cempaka Putih Tengah to Complete May

Central Jakarta Water Resources Sub-agency personnel are improving the water channel on both sides of Jalan Cempaka Putih Tengah III RT 01/05, Cempaka Putih Timur.

We dismantled the old channel

Cempaka Putih District's Head of Water Resources Unit, M Suhadi said the normalization of the 288 meter long channel has been carried out since March 5 by 20 Blue Troop personnel.

Karet Pasar Water Channel Upgrade Nears Early May Completion

"The work is targeted to complete by the end of May," he said, Friday (3/27).

He added that this channel normalization follows up on residents' suggestions because the surrounding area often floods when it rains, due to being unable to accommodate the water flow.

"We dismantled the old channel and replaced it using a 60 x 60 centimeter concrete u-ditch," he added.

Meanwhile, Sumadi (43), a local resident, appreciated the water channel improvement.

"Hopefully, after normalization, our residential area will no longer be flooded when it rains," he hoped.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1600 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1449 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1311 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1079 personDessy Suciati
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye973 personDessy Suciati