You don't have javascript enabled. Good luck with that.
Pencarian
IMG 20260424 WA0003

Ciliwung River Collapsed Retaining Wall Repair on Jalan X Have Reaches 70 Percent

The progress of emergency repairs to the collapsed retaining wall on the Ciliwung River, Jalan X, Kebon Baru Urban Village, Tebet District, South Jakarta has reached around 70 percent.

The work process is quite lengthy

The Coordinator of the South Jakarta Water Resources (SDA) Task Force, Johny, said the landslide occurred in March 2026 and affected at least six rented houses.

"The work process is quite lengthy because the landslide site has a steep slope, which can be dangerous for personnel in the field. Therefore, the work is being carried out with great care," he said, Friday (4/24).

Repair of Tunda Bara Connecting Channel Embankment Completed

Johny explained that temporary repairs involved installing dolken wood to support the ground. The retaining structure is approximately 25 meters long and 15 meters high.

The use of dolken wood is temporary to prevent further landslides. Permanent handling will be implemented through the construction of a more robust retaining wall or embankment.

"In the work process, we deploy around seven to 15 personnel, depending on the level of difficulty in the field," he explained.

Meanwhile, Head of Tebet District, Putut Puji Linangkung stated before the landslide occurred, his party had conducted land acquisition socialization to 396 building owners on the riverbanks.

According to him, land acquisition is one solution to overcome flooding and potential landslides in the area.

"We have been conducting socialization since 2023, then continued in 2024 and 2025," he stated.

According to him, land acquisition is carried out in stages by the Jakarta Provincial Government after in Rawajati Urban Village, Pancoran District, South Jakarta.

"The number of residents affected by the Ciliwung River normalization program in RW 10, Kebon Baru Urban Village, has reached 396 plots. Meanwhile, data collection for RW 11 and RW 14 is still underway," he admitted.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1378 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye1006 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye837 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye644 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye624 personAldi Geri Lumban Tobing