You don't have javascript enabled. Good luck with that.
Pencarian
Pengaspalan jalan jaktim ist

Jalan Kebon Kelapa I Repaved

The Matraman District Public Works Implementation Unit realized the residents' proposal through the Development Planning Meeting (Musrenbang) by re-asphalting Jalan Kebon Kelapa I in RT 01 to RT 04, RW 09, Utan Kayu Selatan Urban Village.

Along a 102-meter

Head of the unit, Nessy Oktavia said as many as 10 Yellow Troop personnel with supporting equipment were deployed to work on paving the neighborhood road using hotmix asphalt.

Vice Mayor Kusmanto Checks Damaged Roads in Cakung and Duren Sawit

"The asphalting was carried out along a 102-meter stretch with a width of 1.5 meters. The road was previously damaged due to peeling asphalt," she said, Tuesday (7/7).

Nessy hopes that the re-paving of this road will provide a greater sense of safety and comfort to residents, especially drivers.

"Even though the road is already smooth, we still remind residents not to drive at high speeds, especially since this is a neighborhood road," she appealed.

Meanwhile, Head of RW 09, Utan Kayu Selatan Urban Village, Adang Rachmat Permana appreciated the swift response of the unit in quickly realizing the community's proposal.

"The road's previous condition was quite disturbing, with many sections of asphalt peeling and potholes, making it uncomfortable for vehicles to traverse. We are very grateful for the repairs," he admitted.

Linked News
Popular News indeks
  1. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1149 personDessy Suciati
  2. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye930 personNurito
  3. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye835 personDessy Suciati
  4. North Jakarta KPKP is Intensively Monitoring Animal Health Service Licensing

    access_time16-07-2026 remove_red_eye801 personAnita Karyati
  5. SDN Srengseng Sawah 15 Continues Face-to-Face Learning

    access_time13-07-2026 remove_red_eye721 personDessy Suciati