You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Air Baru di Jl Pri
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

Water Channel Construction at Jalan Prihatin Reaches 60 Percent

The construction of water channel at Jalan Prihatin, Kelapa Gading Barat, Kelapa Gading has reached 60 percent. As planned before, the channel has length about 620 meter and height 1.3 meter and one meter width.

The area is often inundated due to small drainage

Head Section of Water Management for Kelapa Gading Sub-district, Rukmana, said the channel construction is based on local residents request. The location is always inundated by 20 cm because of bad drainage.

“The area is often inundated due to small drainage. The construction is started from Jalan Inspeksi Kali Sunter through Tabah I connecting channel up to Sentosa Selatan connecting channel and ended at Kodamar reservoir,” she said, Tuesday (8/16).

City Keeps Improving Infrastructure for Flood Handling

According to her, heavy equipment must be deployed to dig the soil. Now the construction has reached 60 percent or 400 meter. It is targeted to complete in a month.

“The project has been running for two months. It is hoped can be completed in September,” she closed.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1219 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye910 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye736 personFolmer
  5. TMII Prepares Stuntman Show to Music Concert

    access_time23-12-2024 remove_red_eye693 personNurito