You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Tanggul Pantura Jakarta untuk Kurangi Banjir
.
photo Reza Hapiz - Beritajakarta.id

Pantura Dike Construction Aims Reducing Flood

Flood in the capital can not be handled well before completing the north beach dike construction. The existing dike height is only 2.8 meters, or still under tidal wave by three meters.

Why flood remains occur, because the dike is yet completed

“Why flood remains occur, because the dike is yet completed,” said Jakarta Governor, Basuki T. Purnama, Monday (8/22).

According to him, flood will remain hit Jakarta of the dike is not completed. If it is added with local rain during three days, then 40 percent of Jakarta areas will be flooded.

City Keeps Improving Infrastructure for Flood Handling

If there is no tidal wave, he added, flood in Jakarta will recede quickly. It is because all water channels are dredged and water pumps are also deployed.

“No tidal wave means flood in Jakarta will quickly recede,” he added.

Basuki admitted keeps buying heavy equipments to dredge the channel. It is predicted channel dredging can be completed in two years by keeping buying heavy equipments.

“Heavy equipments will assist us completing the channel dredging in two years,” he closed.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1150 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye847 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye780 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye757 personAldi Geri Lumban Tobing