You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB KPAD Joglo Dikeruk

A Connecting Channel in Joglo Dredged

The KPAD connecting channel, Joglo Urban Village, Kembangan Sub-district, are dredged by freelancer under Kembangan Sub-district's water management section. Dredging is done due to full of mud.

On the two sides of the channel, a lot of mud dries and make the channel smalle

Section Head of Kembangan Sub-district Water Management, Yusuf Kasim disclosed, to dredge the channel along 300 meters, 30 freelancers of Water Management Sub-dept assisted by one heavy equipment type spider.

"On the two sides of the channel, a lot of mud dries and make the channel smaller," he expressed, Thursday (9/22).

Gubuk Genteng River Dredging to Complete October

He explains, the channel condition is complained by locals via qlue. Due to unoptimal, the water often overflows and inundates the citizen homes.

"We began to dredge now. It's targeted to be complete two weeks ahead," he finished.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye728 personDessy Suciati
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye611 personTiyo Surya Sakti
  3. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye551 personAldi Geri Lumban Tobing
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye509 personFakhrizal Fakhri
  5. Thousand Islands Conducts Vehicle Emission Tests on Three Islands

    access_time07-08-2026 remove_red_eye493 personAnita Karyati