You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB KPAD Joglo Dikeruk

A Connecting Channel in Joglo Dredged

The KPAD connecting channel, Joglo Urban Village, Kembangan Sub-district, are dredged by freelancer under Kembangan Sub-district's water management section. Dredging is done due to full of mud.

On the two sides of the channel, a lot of mud dries and make the channel smalle

Section Head of Kembangan Sub-district Water Management, Yusuf Kasim disclosed, to dredge the channel along 300 meters, 30 freelancers of Water Management Sub-dept assisted by one heavy equipment type spider.

"On the two sides of the channel, a lot of mud dries and make the channel smaller," he expressed, Thursday (9/22).

Gubuk Genteng River Dredging to Complete October

He explains, the channel condition is complained by locals via qlue. Due to unoptimal, the water often overflows and inundates the citizen homes.

"We began to dredge now. It's targeted to be complete two weeks ahead," he finished.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye858 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye796 personAldi Geri Lumban Tobing
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye771 personBudhi Firmansyah Surapati
  4. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye624 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye465 personFolmer