Jl RA Kartini Lebak Bulus Closed Tomorrow
Reported by Suparni | Translated by Rizky Mawardi
Jakarta Dept. of Transportation is about to arrange the traffic at Jalan RA Kartini, Lebak Bulus, South Jakarta. The arrangement is related with Mass Rapid Transit (MRT) construction.
The closure is conducted twice, Saturday (9/24) and Saturday (10/8)
Priyanto, agency’s Traffic Engineering Division Head, said the closure will start on Saturday (9/24) at 10 PM up to Sunday (9/25) at 5 AM.
“The closure is conducted twice, Saturday (9/24) and Saturday (10/8). We have prepared the traffic engineering,” he said, Friday (9/23).
MRT Flyover Lane Enters Girder InstallationTB Simatupang toll road user exiting at Lebak Bulus gate will be diverted to Pondok Pinang exit gate and turn back to Point Square and heading to Pasar Jumat. The non toll flow from Jalan RA Kartini heading to Lebak Bulus is diverted to Jalan Adhyaksa Raya.
The road closure on Saturday (9/24) is related with pedestrian bridge modification by installing new structure in front of Mercure Hotel. While road closure on Saturday (10/8) is related with existing pedestrian bridge demolition.