You don't have javascript enabled. Good luck with that.
Pencarian
Basuki: Tak Ada Pilihan, Harus Bongkar
.
photo Yopie Oscar - Beritajakarta.id

Kemang Flood Reduction Program Needs Acceleration

Jakarta Provincial Government is inventorying the buildings impacted by Krukut river normalization. The normalization is need to be accelerated due to many buildings standing along the riverbank.

We have no choice except controlling the buildings

Jakarta Governor, Basuki T. Purnama, said no other ways overcoming flood in Kemang except with normalization. Normalization is needed since the river width now becomes 4-7 meters from initiate width 20-25 meters.

“We have no choice except controlling the buildings,” he said, Monday (9/26).

October 2016, Krukut River Normalized

Basuki admitted has owned proof of previous river condition. Based on this data, his side will make the area like previous condition.

His side will also check the building ownership. For those who have no certificate will be relocated. And for those who have certificate, the building will be bought.

As planned before, the normalization is slated in October.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1505 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye925 personAldi Geri Lumban Tobing
  3. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye392 personFolmer
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye390 personDessy Suciati
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye367 personTiyo Surya Sakti