Pesanggrahan River Has Dredged Up to 2 Kilometers
access_time October 04 2016 04:05 PM remove_red_eye 1836
Reported by Suparni | Translated by Nugroho Adibrata
Reported by Suparni | Translated by Nugroho Adibrata
The Pesanggrahan River dredging that carried out next to Tanah Kasir TPU, South Jakarta has reached two kilometers long. Dredging itself is focused on the river that already has the sheet pile.
Dredging process has touched Pesanggrahan Urban Village, behind Cavalio Dam. The deep is varied, but we dug it up to three meters
"Dredging process has touched Pesanggrahan Urban Village, behind Cavalio Dam. The deep is varied, but we dug it up to three meters," expressed Irwan Herdiana, Supervisor of Water Agency UPK for Jakarta Cleanliness Dept, Tuesday (10/4).
To conduct dredging, one amphibian excavator sent to the field.
Kedoya Selatan Residents Want Normalization for Pesanggrahan River"Later on, the dredging will be done until Ulujami Bridge," he stated.
Dredging itself is from Kampung Poncol Pesanggrahan Bridge next to Tanah Kusir TPU until Ulujami Bridge, Cipulir.