You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Kali Pesanggrahan Sudah Dua Kilometer

Pesanggrahan River Has Dredged Up to 2 Kilometers

The Pesanggrahan River dredging that carried out next to Tanah Kasir TPU, South Jakarta has reached two kilometers long. Dredging itself is focused on the river that already has the sheet pile.

Dredging process has touched Pesanggrahan Urban Village, behind Cavalio Dam. The deep is varied, but we dug it up to three meters

"Dredging process has touched Pesanggrahan Urban Village, behind Cavalio Dam. The deep is varied, but we dug it up to three meters," expressed Irwan Herdiana, Supervisor of Water Agency UPK for Jakarta Cleanliness Dept, Tuesday (10/4).

To conduct dredging, one amphibian excavator sent to the field. 

Kedoya Selatan Residents Want Normalization for Pesanggrahan River

"Later on, the dredging will be done until Ulujami Bridge," he stated.

Dredging itself is from Kampung Poncol Pesanggrahan Bridge next to Tanah Kusir TPU until Ulujami Bridge, Cipulir.

Linked News
Popular News indeks
  1. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye535 personDessy Suciati
  2. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye530 personAldi Geri Lumban Tobing
  3. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye527 personAldi Geri Lumban Tobing
  4. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye515 personFolmer
  5. Basic Supplies Distributed to Pinang Ranti Fire Survivors

    access_time09-10-2026 remove_red_eye505 personNurito