You don't have javascript enabled. Good luck with that.
Pencarian
Penertiban Kemang Tunggu Peta Bidang dari BPN

Kemang Controlling Awaits BPN’s Inventory Map

Jakarta Provincial Government still awaits the inventorying map from National Land Board (BPN) before normalizing Krukut river. As planned before, buildings without certificate in Kemang, South Jakarta will be dismantled.

We’ll prepare the trace right after getting the map from BPN

Jakarta Governor, Basuki T. Purnama said Jakarta Dept. of City Spatial Planning will determine the trace based on the map from BPN.

“We’ll prepare the trace right after getting the map from BPN,” he said, Wednesday (10/5).

City Analyzed Cause of Flooding in Kemang

There are 505 buildings impacted by the project. Some of the buildings have certificate. But buildings without certificate will be demolished first.

Basuki added that the dismantling is aimed to support river normalization project. Buildings along the riverbank causes Kemang area is always flooded.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye924 personAldi Geri Lumban Tobing
  2. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye599 personDessy Suciati
  3. Fire Site in Utan Kayu Utara Being Cleared

    access_time11-08-2026 remove_red_eye445 personNurito
  4. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye434 personAldi Geri Lumban Tobing
  5. Transportation Agency Prepares Traffic Management Plan for Indonesia's 81st Anniversary Celebrations

    access_time15-08-2026 remove_red_eye414 personAldi Geri Lumban Tobing