You don't have javascript enabled. Good luck with that.
Pencarian
       Turap Saluran Air di Jl Perintis Kemerdekaan Diperbaiki

Gading Kusuma Drain Normalized

The Gading Kusuma Drain that located on Jl Perintis Kemerdekaan, Kelapa Gading Timur Urban Village, Kelapa Gading Sub-district is normalized. After it is completed, the next step is sheet pile reparation at the same place.

160 meters will be carried out for the broken sheet pile and 33 meters for its elevation as high as 40 centimeters

Section Head of Water Management for Kelapa Gading Sub-district, Rukmana disclosed normalization is carried out up to 585 meters and will be deepened up to 80 centimeters. While for sheet pile reparation, will be done up to 193 meters.

"160 meters will be carried out for the broken sheet pile and 33 meters for its elevation as high as 40 centimeters," he told, Tuesday (10/11).

Krukut River will Be Normalized Up to 10 KM

He explains, every rain falls, the street around the school is often inundated up to 40 centimeters. Hence, sheet pile reparation will be followed up by improving the street. Such project is targeted to be complete by the end of this year.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye732 personBudhi Firmansyah Surapati
  2. Kampung Melayu Sports Facility Inaugurated to Tackle Brawls

    access_time06-11-2026 remove_red_eye691 personDessy Suciati
  3. Jakarta to Develop Its First Mangrove Botanical Garden

    access_time06-11-2026 remove_red_eye680 personDessy Suciati
  4. Kampung Rambutan 1 Reservoir to Combine Flood Control with Public Recreation

    access_time06-11-2026 remove_red_eye653 personAldi Geri Lumban Tobing
  5. Aid for Fire Survivors at Pinus Elok Flats Has Been Distributed

    access_time06-11-2026 remove_red_eye651 personNurito