You don't have javascript enabled. Good luck with that.
Pencarian
Kembali, Pembangunan Waduk Rambutan Terkendala BBM
.
photo Nurito - Beritajakarta.id

Heavy Equipments for Rambutan 1 Reservoir Operation Stopped

The construction of Rambutan 1 reservoir in Kampung Rambutan, Ciracas, East Jakarta is neglected once again. It is because of no diesel fuel supply for the heavy equipments.

I have no idea about that

Yayat (37), one of local residents, the four heavy equipments have not operated since Friday (10/14).

“I have no idea about that,” he said, Monday (10/17).

Rambutan 1 Reservoir Project Needs Additional Equipment

After being confirmed, project supervisor, Marudin, admitted there is no diesel fuel supply for the heavy equipments. It is allegedly that the late supply is caused by administration process.

Meanwhile, Jakarta Head Dept. of Water Management, Teguh Hendarwan, refused if the project is neglected.

“I’ll check it later. The project remains run,” he stated.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1150 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye847 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye780 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye757 personAldi Geri Lumban Tobing