Heavy Equipments for Rambutan 1 Reservoir Operation Stopped
access_time October 18 2016 12:15 PM remove_red_eye 1123
Reported by Nurito | Translated by Rizky Mawardi
Reported by Nurito | Translated by Rizky Mawardi
The construction of Rambutan 1 reservoir in Kampung Rambutan, Ciracas, East Jakarta is neglected once again. It is because of no diesel fuel supply for the heavy equipments.
I have no idea about that
Yayat (37), one of local residents, the four heavy equipments have not operated since Friday (10/14).
“I have no idea about that,” he said, Monday (10/17).
Rambutan 1 Reservoir Project Needs Additional EquipmentAfter being confirmed, project supervisor, Marudin, admitted there is no diesel fuel supply for the heavy equipments. It is allegedly that the late supply is caused by administration process.
Meanwhile, Jakarta Head Dept. of Water Management, Teguh Hendarwan, refused if the project is neglected.
“I’ll check it later. The project remains run,” he stated.