You don't have javascript enabled. Good luck with that.
Pencarian
23 Saluran Air di Jaktim Dinormalisasi

23 Channels in East Jakarta Normalized

East Jakarta Water Management Sub-dept does normalization and build new water channels at 23 points with total length of 21 kilometers.

Construction and normalization of water channel to overcome inundation that often occurs every rainy season

"Construction and normalization of water channel to overcome inundation that often occurs every rainy season," said Achmad Daeroby, Head of Development and Improvement of Flood Management System for East Jakarta Water Management Sub-dept, Wednesday (11/9).

He stated, according to contract, normalization project at 23 points of channels has been ongoing since August 30, 2016 and will be complete on November 27. It spends Rp 57.977 billion.

Connecting Channel Jalan Krendang Utara Normalized

"Our main problem is utility network in the channel thus needs time for the relocation," he finished.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye877 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye869 personTiyo Surya Sakti
  3. Coastal Children Enthusiastic Over Betawi Dance Training at Arung Palaka Hub

    access_time02-02-2026 remove_red_eye466 personAnita Karyati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye380 personAldi Geri Lumban Tobing
  5. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye379 personDessy Suciati
close