You don't have javascript enabled. Good luck with that.
Pencarian
Turap Kali Sunter di Lubang Buaya Ambrol
.
photo Nurito - Beritajakarta.id

Collapsed Sheet Pile in Lubang Buaya will Be Repaired Soon

The Sunter sheet pile that located at Al Umar Mosque, RT 01/02 Lubang Raya, Cipayung that was collapsed a week ago has not been repaired. If not, it would spread to another part.

It must be repaired as soon as possible. If not, it will spread to another part

Mayor of East Jakarta, Bambang Musyawardana disclosed sheet pile that collapsed along 20 meters with 1.5-2 meters high. Thus far, the urban village side has proposed reparation to the Water Management Sub-dept.

"It must be repaired as soon as possible. If not, it will spread to another part," he stated, when he surveyed the location, Wednesday (11/9).

Locals Request Improvement of Collapsed Bridge in Pejaten Timur

Head of East Jakarta Water Management Sub-dept, Ahmad Yazied Bustomi admitted has got a report and promised to repair it. He assessed, the damage is not too severe and can be quickly repaired.

"We'll repair it as soon as possible," he promised.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye528 personBudhi Firmansyah Surapati
  2. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye488 personAldi Geri Lumban Tobing
  3. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye414 personDessy Suciati
  4. S. Jakarta Mayor: Idul Adha is a Moment to Enhance Compassion Among One Another

    access_time06-06-2025 remove_red_eye324 personTiyo Surya Sakti
  5. North Jakarta Mayor Ensures Basic Needs of Kapuk Muara Fire Victims Are Met

    access_time07-06-2025 remove_red_eye285 personNurito

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik