You don't have javascript enabled. Good luck with that.
Pencarian
Rolling door belum terpasang. Sementara listrik belum maksimal, gimana pembeli mau datang,
Para pedagang di Blok III Pasar Senen yang menjadi korban kebakaran masih enggan menempati kios sementara di Blok V Pasar Senen. Dari 1.170 kios yang disediakan oleh PD Pasar Jaya, saat ini baru 20 kios yang ditempati pedagang. .
photo istimewa - Beritajakarta.id

Pasar Senen Traders Refuse to Occupy Temporary Kiosks at Block V

A number of traders at Block III Pasar Senen who became fire victims are still reluctant to occupy the temporary kiosks in Block V, Pasar Senen. Of the 1,170 kiosks provided by PD Pasar Jaya, only 20 kiosks are occupied.

The rolling door is not yet installed and lack of lighting in Block III, how buyers want to come?

Sugito, (54), one of used clothing traders at Block III, admitted that he did not want to occupy kiosk in Block V due to uncomfortable place, like there is no rolling door and lack of lighting

Pasar Senen Traders Refuse Relocation

"The rolling door is not yet installed and lack of lighting in Block III, how buyers want to come?," he lamented, Friday (5/23).

As a result, there are still many traders who sell on the sidewalk and the roadside, causing traffic congestion.

Central Jakarta Satpol PP Head, Yadi Rusmayadi stressed that his personnel will control those who are still selling on the sidewalk if the relocation process to temporary shelter is completed.

"We'll wait for the relocation process for traders to temporary shelter. If it is done and we see traders sell on roadside, we will control them," he expressed.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye395 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik