You don't have javascript enabled. Good luck with that.
Pencarian
Dinas SDA Koordinasi Dengan BWSCC Untuk Percepat Pembangunan Sheet Pile
.
photo Reza Hapiz - Beritajakarta.id

City Performs Flood-handling Steps

City Water Resources Dept. performs flood-handling steps in the capital, especially in Cipinang Melayu area, Makasar Sub-district and Gg. Arus, Cawang, East Jakarta.

Preventively, bronjong has been built since the first day, including additional sand. The longest, will take one week, because we already have materials plus workers

It can be seen from construction of bronjong (levees made of stone piles with wire) that functions to minimize water volume.

"Preventively, bronjong has been built since the first day, including additional sand. The longest, will take one week, because we already have materials plus workers," said Teguh Hendrawan, Head of City Water Resources Dept., Monday (2/20).

Public Kitchen Set Up in Cipinang Melayu

Then for flood in Cipinang Melayu residential is mostly caused by broken levee located in Vila Nusa Housing Complex, Bekasi. Besides, Sunter River normalization is still unfinished.

While flood in Gg. Arus, Cawang is mostly caused by unfinished normalization at Ciliwung River and installation of sheet pile. Nevertheless, normalization authority lies in the Ciliwung-Cisadane Flood Control Office (BWSCC).

"We already coordinating with BWSCC for accelerating sheet pile installation," he closed.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye397 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye354 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik