You don't have javascript enabled. Good luck with that.
Pencarian
saluran ditutup beton
saluran ditutup beton .
photo istimewa - Beritajakarta.id

Often Overflows, Residents Request for Micro Drainage Dredging

Many of micro drainage in North Jakarta are in poor condition due to rarely drain. As a result, it often overflowed when heavy rain comes, and surely inundating resident's settlement.

We have repeatedly reported this matter through the Regional Development Planning Forum (Musrenbang), but there has no realization

Such condition is seen on Jalan Mangga west and east side. A micro drainage as long as 200 meters is filled with mud, and covered by buildings above it. Thus, water as high as 30 cm can easily inundate RT 16 and 16 of RW 08, Lagoa Urban Village, Koja when rain pours.

Flood in Kampung Pulo Can Only Be Solved if Residents Moved to Flats

Chairman of RT 15/08, Cardianto, admitted that drainage is almost 14 years have never been cleaned. Moreover, the residents have difficulty to do communal work because the drainage is covered by concrete.

"We have repeatedly reported this matter through the Regional Development Planning Forum (Musrenbang), but there has no realization. We hope related unit can immediately dredge the drainage and demolish its concrete, as well as construct an u-ditch for ease of cleaning," he hoped, Wednesday (6/4).

When being contacted, Head of Water Resources Maintenance Division, North Jakarta Water Management Public Works Sub-Department, Kuryatna Atmadja admitted that many micro drainage in North Jakarta are very worrying. Therefore, his party will repair micro and macro drainage in 123 points this year.

"98 points of micro drainage repair have been proposed and being processed," he added.

The locations are, micro drains on Jalan Manggar, Mindi, Lagoa Terusan and Mahoni, Koja. Then Jalan Malaka Jaya, Rorotan Tiga and Marunda Baru, Cilincing, also Jalan Bandengan Utara, Pademangan Empat and Lodan, Pademangan.

“We are going to make various reparations. Starts from normalization, escalation, dredging and new construction,” he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1042 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye907 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye551 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye382 personAldi Geri Lumban Tobing